
{"id":100000112811,"date":"2026-09-29T15:16:15","date_gmt":"2026-09-29T07:16:15","guid":{"rendered":"https:\/\/www.goodrichglobal.com\/singapore\/article\/green-data-centres-singapore-fit-out\/"},"modified":"2026-09-29T15:19:15","modified_gmt":"2026-09-29T07:19:15","slug":"green-data-centres-singapore-fit-out","status":"publish","type":"post","link":"https:\/\/www.goodrichglobal.com\/singapore\/article\/green-data-centres-singapore-fit-out\/","title":{"rendered":"Green Data Centres in Singapore: What It Means for Fit-Out"},"content":{"rendered":"<p>Singapore has made its position clear: new data centre capacity will be granted, but only to facilities that are among the most efficient and lowest-carbon in the world. On 21 August 2026, the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA) announced that four operators, Digital Realty, Equinix, Keppel Data Centres and ST Telemedia Global Data Centres, would each receive 50MW under the second Data Centre Call for Application (DC-CFA2). The new facilities will sit in a low-carbon data centre park that JTC is developing on Jurong Island.<\/p>\n<p>Most coverage focuses on power, cooling and green energy, and rightly so. But green data centres also raise the bar for everyone involved in the fit-out, from architects and interior designers to contractors and material suppliers. This article looks at what Singapore&#8217;s approach means for the parts of a data centre that are not servers.<\/p>\n<p><strong>The short version:<\/strong> Singapore allocates data centre capacity competitively and on sustainability merit. Energy performance dominates, but the same logic flows into the building fabric: <strong>lower embodied carbon, low-emission finishes, durable materials and verifiable certification<\/strong>. Fit-out teams that bring documented products to the table early make it easier for operators to meet their green commitments.<\/p>\n<h2>How Singapore Allocates Data Centre Capacity<\/h2>\n<p>After a pause on new data centres in 2019, Singapore moved to a selective model. Capacity is released in rounds, and operators compete on the quality of their proposals rather than simply queueing for power. DC-CFA2 opened on 1 December 2025 and closed on 31 March 2026. Applicants were asked to propose best-in-class energy and IT efficiency, and to power at least half of their capacity from green energy sources such as biomethane, low-carbon ammonia or hydrogen, fuel cells with carbon capture, or on-site solar. The selected proposals have also been reported to commit to Green Mark for Data Centres at Platinum level.<\/p>\n<p>This sits within IMDA&#8217;s Green Data Centre Roadmap, which aims to grow capacity while pushing operators towards lower power usage effectiveness (PUE) over time. EDB and IMDA have said they will review the need for a further call in 18 to 24 months. For the industry, the signal is that every future round is likely to set the bar higher still.<\/p>\n<h2>Why Green Criteria Reach Beyond the Data Hall<\/h2>\n<p>Energy use during operation is by far the largest part of a data centre&#8217;s carbon footprint. But three pressures bring the rest of the building into scope:<\/p>\n<ul>\n<li><strong>Whole-life carbon thinking.<\/strong> Singapore&#8217;s green building framework increasingly looks at embodied carbon from materials alongside operational energy. The approach is familiar from Green Mark for general buildings, explained in our <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/green-mark-v7-whole-life-carbon-fit-out\/\">whole-life carbon fit-out guide<\/a>.<\/li>\n<li><strong>Carbon pricing.<\/strong> Singapore&#8217;s carbon tax rose to S$45 per tonne for 2026 and 2027, with a stated path to S$50 to S$80 by 2030. Operators&#8217; electricity costs and emissions reporting are affected, which sharpens attention on every part of the asset.<\/li>\n<li><strong>Corporate reporting.<\/strong> Hyperscale tenants and listed operators report emissions and increasingly ask suppliers for product-level data. A fit-out without documentation creates gaps in that reporting.<\/li>\n<\/ul>\n<h2>Where Fit-Out Choices Make a Difference<\/h2>\n<p>A data centre campus includes offices, control rooms, meeting spaces, welfare areas, corridors and visitor facilities. Our guide to <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/data-centre-control-room-flooring-singapore\/\">data centre control room and support space flooring<\/a> covers these in detail. In these spaces, material choices affect sustainability outcomes in four ways.<\/p>\n<h3>1. Embodied carbon<\/h3>\n<p>Flooring, wallcoverings and ceilings cover large areas, so their embodied carbon adds up. Ask for <strong>Environmental Product Declarations (EPDs)<\/strong>, which give verified life-cycle figures instead of conservative defaults. Recycled-content carpet tiles and modular products that can be replaced piece by piece both lower the carbon cost over the building&#8217;s life.<\/p>\n<h3>2. Indoor air quality<\/h3>\n<p>Control rooms and offices are staffed around the clock. Low-VOC finishes and adhesives protect indoor air for the people who run the facility. Look for labels such as CRI Green Label Plus for carpet, FloorScore for resilient floors and GREENGUARD for wall and furniture finishes. Our <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/indoor-air-quality-interior-materials\/\">indoor air quality guide<\/a> explains what each covers.<\/p>\n<h3>3. Durability and replacement cycles<\/h3>\n<p>A data centre runs for decades, and a finish replaced three times over that life carries three times the embodied carbon. Durable, repairable materials such as modular carpet tiles, commercial-grade vinyl wallcoverings and impact-resistant wall protection in corridors reduce both waste and disruption to a live facility.<\/p>\n<h3>4. Verified local certification<\/h3>\n<p>The <strong>Singapore Green Building Product (SGBP)<\/strong> scheme rates products in tiers from one to four ticks, giving specifiers a locally recognised benchmark. Goodrich&#8217;s Axminster wool carpet with SB latex unitary backing carries the four-tick &#8220;Leader&#8221; rating, and the J.Josephson Vycon wallcoverings it distributes hold a two-tick &#8220;Very Good&#8221; rating. Our <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/sgbc-certification-ladder-specifiers-guide\/\">SGBC certification ladder guide<\/a> explains how the tiers map to project credits.<\/p>\n<h2>Technical Rooms: Green and Functional<\/h2>\n<p>Inside technical rooms, performance comes first. Static control, cleanliness and load capacity are non-negotiable. Sustainability still has a role: <strong>anti-static vinyl tiles<\/strong> that are modular, easy to maintain and replaceable tile by tile avoid wholesale floor replacement when equipment layouts change. Goodrich supplies the Sangetsu OT anti-static vinyl tile range for these spaces. See our <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/flooring-for-server-room-data-centre\/\">server room and data centre flooring guide<\/a> for how to specify them.<\/p>\n<h2>A Checklist for Fit-Out Teams<\/h2>\n<ul>\n<li><strong>Add a documentation column<\/strong> to the finishes schedule covering EPD, emissions label, SGBP rating and fire certificate for each product.<\/li>\n<li><strong>Request certificates at selection,<\/strong> not at handover. Operators&#8217; green commitments are often tested early.<\/li>\n<li><strong>Prioritise modular and repairable formats<\/strong> for high-wear areas.<\/li>\n<li><strong>Match performance to zone.<\/strong> Anti-static where equipment is handled, low-emission and acoustic comfort where people work.<\/li>\n<li><strong>Plan for change.<\/strong> Data centres are refitted as technology evolves, so choose finishes that can be partly replaced rather than stripped out.<\/li>\n<\/ul>\n<p>Our <a href=\"https:\/\/www.goodrichglobal.com\/singapore\/article\/green-mark-v7-materials-epd-certification\/\">Green Mark v7 materials and certification guide<\/a> sets out how to assemble this documentation in practice.<\/p>\n<h2>Final Thoughts<\/h2>\n<p>Singapore&#8217;s data centre policy treats capacity as a scarce resource awarded to the most efficient bidders. That discipline naturally extends to the building around the servers. Fit-out teams that specify low-carbon, low-emission, durable and certified finishes, and can prove it, help operators meet the commitments that won them capacity in the first place.<\/p>\n<p><strong><a href=\"https:\/\/www.goodrichglobal.com\/singapore\/contact-us\/request-quotation\/\">Talk to Goodrich Global<\/a> about certified flooring, wallcovering and acoustic solutions for data centre and mission-critical fit-outs.<\/strong><\/p>\n<h2>Frequently Asked Questions<\/h2>\n<h3>What is DC-CFA2 in Singapore?<\/h3>\n<p>DC-CFA2 is the second Data Centre Call for Application run by EDB and IMDA. It opened in December 2025 and in August 2026 allocated 200MW of new capacity, 50MW each to Digital Realty, Equinix, Keppel Data Centres and ST Telemedia Global Data Centres, in a low-carbon data centre park on Jurong Island.<\/p>\n<h3>What makes a data centre green in Singapore?<\/h3>\n<p>Mainly energy and IT efficiency, measured through indicators such as PUE, plus the share of power drawn from green energy. DC-CFA2 required at least 50 percent green energy. Green building certification for data centres and lower-carbon materials in the building fabric also contribute.<\/p>\n<h3>Do interior finishes matter in a green data centre?<\/h3>\n<p>Yes, though less than energy. Finishes add embodied carbon, affect indoor air quality for staff in control rooms and offices, and determine how often materials are replaced. Specifying EPD-backed, low-VOC, durable and SGBP-certified products supports an operator&#8217;s wider sustainability commitments.<\/p>\n<h3>What certifications should data centre fit-out materials have?<\/h3>\n<p>Useful documentation includes an Environmental Product Declaration for embodied carbon, emissions labels such as CRI Green Label Plus or FloorScore, a Singapore Green Building Product rating, and current fire test certificates. Technical rooms also need static-control test data for anti-static flooring.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Singapore has made its position clear: new data centre capacity will be granted, but only to facilities that are among the most efficient and lowest-carbon in the world. On 21 August 2026, the Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA) announced that four operators, Digital Realty, Equinix, Keppel<\/p>\n","protected":false},"author":15,"featured_media":100000112816,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[486175],"tags":[],"class_list":["post-100000112811","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-insights"],"meta_box":{"badge_text":""},"_links":{"self":[{"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/posts\/100000112811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/comments?post=100000112811"}],"version-history":[{"count":0,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/posts\/100000112811\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/media\/100000112816"}],"wp:attachment":[{"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/media?parent=100000112811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/categories?post=100000112811"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.goodrichglobal.com\/singapore\/wp-json\/wp\/v2\/tags?post=100000112811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}